ZA Tech
ZA Tech ApexForge 600: Waterless Plug & Play 600kW Liquid Cooled Container Data Center – Deploy in 2 Months
ZA Tech ApexForge 600: Waterless Plug & Play 600kW Liquid Cooled Container Data Center – Deploy in 2 Months
Couldn't load pickup availability
Unlock Instant AI Compute Capacity with the ZA Tech ApexForge 600
The ApexForge 600 is a complete, factory-built, plug-and-play containerized data center engineered for the highest-density GPU workloads (HGX B300, GB300 NVL72, Rubin, and 8x RTX 5090 servers). Designed in California and built for rapid global deployment, this turnkey solution eliminates the pain of traditional data center construction.
The only Rapid deploy AI data center with waterless liquid cooling
Why Choose ApexForge 600?
- Lightning-Fast Deployment: Fully operational in approximately 2 months - simply site-prep, deliver the containers (Computing + Electrical + Cooling), connect power/fiber, install your IT equipment, and go live. No lengthy permitting, civil works, or on-site construction required.
- Massive Cost & Time Savings: Traditional data center infrastructure costs ~USD 15,000 per kW and takes 18–24+ months to build. The ApexForge 600 delivers at a competitive price point with full cooling, power, and infrastructure integrated — dramatically lowering your upfront CAPEX and time-to-revenue.
- Waterless Cold Plate Technology (ETCF-HK Nanofluid): Our proprietary insulating dielectric nanofluid eliminates water risks in the data hall (no leaks, corrosion, or facility water infrastructure). Achieves GPU junction temperatures of 47–52°C, excellent material compatibility, 5–8 year fluid life, and full RoHS/REACH compliance. Safer, greener, and lower maintenance than traditional PG25/water-glycol systems.
Optimized TCO Benefits (CFO Perspective)
- PUE of 1.1–1.2 (demonstrated in real-world testing) vs. 1.5+ for air-cooled or higher for many legacy systems.
- 30%+ lower energy consumption → major OPEX savings at $0.08–0.15/kWh US rates.
- Higher rack density, extended GPU/server lifespan from cooler operation, reduced maintenance, and minimal downtime.
- Lower overall 3–5 year TCO through energy efficiency, risk reduction, and faster monetization of compute capacity.
Key Technical Highlights
- 600–720kW IT load capacity in three 20-ft containers.
- Advanced short-loop CDU-CR with dual redundant pumps.
- Hybrid cooling for maximum efficiency.
- Plug-and-play integration for latest AI servers.
This containerized solution is highly market-competitive in 2026’s explosive AI infrastructure boom. It greatly shortens installation time, slashes operation and maintenance costs, and lets you bypass traditional build complexities entirely.
Price: $9,999/kW
Made to order: 8-12 weeks lead time
Warranty: Up to 3 years
Ready to deploy tomorrow’s compute today? Contact us for custom configurations, pilots, and volume pricing.
Share
