{"product_id":"za-tech-apexforge-600-waterless-container-data-center","title":"ZA Tech ApexForge 600: Waterless Plug \u0026 Play 600kW Liquid Cooled Container Data Center – Deploy in 2 Months","description":"\u003cp dir=\"auto\"\u003e\u003cstrong\u003eUnlock Instant AI Compute Capacity with the ZA Tech ApexForge 600\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp dir=\"auto\"\u003eThe \u003cstrong\u003eApexForge 600\u003c\/strong\u003e is a complete, factory-built, plug-and-play containerized data center engineered for the highest-density GPU workloads (HGX B300, GB300 NVL72, Rubin, and 8x RTX 5090 servers). Designed in California and built for rapid global deployment, this turnkey solution eliminates the pain of traditional data center construction.\u003c\/p\u003e\n\u003ch2 dir=\"auto\"\u003eThe only Rapid deploy AI data center with waterless liquid cooling\u003c\/h2\u003e\n\u003cp dir=\"auto\"\u003e\u003cstrong\u003eWhy Choose ApexForge 600?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul dir=\"auto\"\u003e\n\u003cli\u003e\n\u003cstrong\u003eLightning-Fast Deployment\u003c\/strong\u003e: Fully operational in approximately \u003cstrong\u003e2 months\u003c\/strong\u003e - simply site-prep, deliver the containers (Computing + Electrical + Cooling), connect power\/fiber, install your IT equipment, and go live. No lengthy permitting, civil works, or on-site construction required.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMassive Cost \u0026amp; Time Savings\u003c\/strong\u003e: Traditional data center infrastructure costs \u003cstrong\u003e~USD 15,000 per kW\u003c\/strong\u003e and takes 18–24+ months to build. The ApexForge 600 delivers at a competitive price point with full cooling, power, and infrastructure integrated — dramatically lowering your upfront CAPEX and time-to-revenue.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWaterless Cold Plate Technology (ETCF-HK Nanofluid)\u003c\/strong\u003e: Our proprietary insulating dielectric nanofluid eliminates water risks in the data hall (no leaks, corrosion, or facility water infrastructure). Achieves GPU junction temperatures of 47–52°C, excellent material compatibility, 5–8 year fluid life, and full RoHS\/REACH compliance. Safer, greener, and lower maintenance than traditional PG25\/water-glycol systems.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp dir=\"auto\"\u003e\u003cstrong\u003eOptimized TCO Benefits (CFO Perspective)\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul dir=\"auto\"\u003e\n\u003cli\u003ePUE of \u003cstrong\u003e1.1–1.2\u003c\/strong\u003e (demonstrated in real-world testing) vs. 1.5+ for air-cooled or higher for many legacy systems.\u003c\/li\u003e\n\u003cli\u003e30%+ lower energy consumption → major OPEX savings at $0.08–0.15\/kWh US rates.\u003c\/li\u003e\n\u003cli\u003eHigher rack density, extended GPU\/server lifespan from cooler operation, reduced maintenance, and minimal downtime.\u003c\/li\u003e\n\u003cli\u003eLower overall 3–5 year TCO through energy efficiency, risk reduction, and faster monetization of compute capacity.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp dir=\"auto\"\u003e\u003cstrong\u003eKey Technical Highlights\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul dir=\"auto\"\u003e\n\u003cli\u003e600–720kW IT load capacity in three 20-ft containers.\u003c\/li\u003e\n\u003cli\u003eAdvanced short-loop CDU-CR with dual redundant pumps.\u003c\/li\u003e\n\u003cli\u003eHybrid cooling for maximum efficiency.\u003c\/li\u003e\n\u003cli\u003ePlug-and-play integration for latest AI servers.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp dir=\"auto\"\u003eThis containerized solution is \u003cstrong\u003ehighly market-competitive\u003c\/strong\u003e in 2026’s explosive AI infrastructure boom. It greatly shortens installation time, slashes operation and maintenance costs, and lets you bypass traditional build complexities entirely.\u003c\/p\u003e\n\u003cp dir=\"auto\"\u003ePrice: \u003cstrong\u003e$9,999\/kW\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp dir=\"auto\"\u003eMade to order: \u003cstrong\u003e8-12 weeks lead time\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp dir=\"auto\"\u003eWarranty: Up to \u003cstrong\u003e3 years\u003cbr\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0626\/0795\/0019\/files\/container2.png?v=1778832064\" alt=\"\"\u003e\u003cbr\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp dir=\"auto\"\u003eReady to deploy tomorrow’s compute today? Contact us for custom configurations, pilots, and volume pricing.\u003c\/p\u003e","brand":"ZA Tech","offers":[{"title":"Default Title","offer_id":45183321571523,"sku":null,"price":6000000.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0626\/0795\/0019\/files\/Image_20260514221924_30_56_518f9437-5d32-4477-8519-0845e76d4970.jpg?v=1778829962","url":"https:\/\/www.zatechinc.com\/products\/za-tech-apexforge-600-waterless-container-data-center","provider":"ZATechInc.com","version":"1.0","type":"link"}